Hernando Paving Project
The work to be done consists of furnishing and delivering all equipment, materials and labor necessary to provide for a one and one half (1 1/2) inch asphalt surface course on the project streets listed in the bid package. A one (1) inch leveling course will be required on several streets. There also will be additional patching for some streets for any failed areas that will be identified by the Engineer.
Bid Documents
(click to expand/collapse)

Hard copies of plans and specifications are available for purchase, or files may be downloaded for free from our online plan room. For questions about accessing the documents please contact Memphis Reprographics at 901-590-4862.
Name | Size | |||
001 Hernando Paving 2025 | 15.3 MB | |||
002 SaddleBrook Dr. Asphalt Paving 2025 | 15.3 MB | |||
003 Hernando Paving 2025 | 15.3 MB | |||
004 Hernando Paving 2025 | 15.3 MB | |||
005 Hernando Paving 2025 | 15.3 MB | |||
006 Cross Creek Sub. Entrance Asphalt Paving 2025 | 15.3 MB | |||
007 Classic Drive S Paving 2025 | 15.3 MB | |||
008 Hernando Paving 2025 | 15.3 MB | |||
009 Conger Court Loop Paving 2025 | 15.3 MB | |||
010 Hernando Paving 2025 | 15.3 MB | |||
011 Hernando Paving 2025 | 15.3 MB |